Projects


Meon Shore


Off grid property

Full Victron design and installation 3kw output with 6kw of battery storage.

External emergency switch as system is in the loft due to closeness to the sea. 

Fire rated loft area with ventilation and smoke detection.

 

Emsworth 

Electrical 

Full Electrical design and installation for modern living working with Client, Architect and Contractors. 

Energy  

Heat pump heating system electrical supplies, Heat pump by others.

Due to Heat pump heating the PV system was designed to support the loading.

6kw Giv Energy All In One with a 3.6kw PV inverter supporting the Heat pump 6kw load. 

EPS back up with the Giv energy gateway 

 

Bishop's Waltham 

Heat pump heating by others

6kw Giv Energy All In One with 3.6kw Pv Inverter to support the Heat pump loading.

Full property back up with the GIV Energy Gateway

Tigo Optimisation and Management 

 

Durley

Full 5kw PV system design and installation

Eddi hot water diverter 

Sub main power supply to the Barn 

EPS power supply for grid failure 

 

Burridge  

Electrical works 

Full Design and Electrical installtion for 5 bedroom property 

Energy 

3.68kw Pv system with Battery Storage with integrated panels to garage roof


 EMSWORTH

Specification -
Full Electrical Design and Installation of property for all Modern uses. 

3.68kw Hybrid PV system with Battery Storage 

EPS back up for essential circuits - Heating, internet, small power etc. 

Immersion Switch for surplus energy going back to the grid

Optimisation and management of solar panels.

Networking and Data points.

Heating control and wiring. 

Electric underfloor heating